WITH less than two months to the end of its tenure, the Buhari administration has approved the sum of N6.28 billion for the maintenance of the Third Mainland Bridge in Lagos State.
Minister of Works and Housing, Babatunde Fashola, said after the Federal Executive Council – FEC, meeting in Abuja on Wednesday, said that the 24-month repair will cover 11 kilometres, including interchanges, ramps, and critical links.
Fashola said the move aligns with Executive Order 11 signed by President Muhammadu Buhari in April 2022, giving legal backing to the country’s national maintenance policy.
“I have been asked about the works that have been done on the bridge before. The works are concentrating largely on the substructure of the bridge; the underwater piles, the pile caps and also the replacement of the expansion joints and the bearings.
“These are maintenance works that are critical to the structural integrity of the bridge. What we’re dealing with now is different. It is the driving surface and also the aesthetics. Some of the rails have been stolen. Some of the pleats are misaligned at the routes that lead you on and off the bridge.”
He added that there are no anticipated prolonged closures during the works,’’ Fashola said.
The minister added that the state’s Public Works Corporation will focus on the functional structure of the bridge while the Federal Government will undertake surface maintenance to treat potholes and restore missing guard rails.